Project

Project overview for line 1

On this page, projects and studies carried out by PUC "Belgrade Metro and Train" are presented, with the aim of providing a transparent and clear insight into the company's activities and the development of the metro system in Belgrade.

BMV Logo
Completed projects

13/04/2026

Updating the transport model of Belgrade with traffic studies of the characteristics of movement, the holder of the work: City of Belgrade, City Administration of the City of Belgrade, Secretariat for Traffic, December 2015.

BMV Logo
Completed projects

13/04/2026

Architectural competition for the preliminary design of the metro station line 1 (phase 1) of the Belgrade metro, January 2022.

BMV Logo
Completed projects

13/04/2026

Geodetic foundations for the needs of the Plan of General Regulation of Rail Systems in Belgrade with elements of detailed elaboration for the first phase of the first line of the metro system

BMV Logo
Completed projects

13/04/2026

Environmental protection study for the corridor of the planned two metro lines, contractor: Public Utility Company Belgrade Metro and Train, February 2020

BMV Logo
Completed projects

13/04/2026

Elaborate on geological research for the TBM section from para. Pancevac bridge (exclusively) until the end of the first phase of line 1, February 2023.

BMV Logo
Completed projects

13/04/2026

Elaborate on geotechnical construction conditions for the needs of the Conceptual Project for the construction of the first phase

BMV Logo
Completed projects

13/04/2026

Elaborate on engineering geological-geotechnical construction conditions for the purposes of the Conceptual Project for the construction of the first phase of the first metro line in Belgrade from Makiš station to Karaburma station, November 2021.

BMV Logo
Completed projects

13/04/2026

Conceptual design of the depot in Makish for line 1 and line 2 of the metro

BMV Logo
Completed projects

13/04/2026

Conceptual project of filling the ground in the area of ​​the planned metro depot in Makiško polje - job holder Directorate for construction land and construction of Belgrade JP, July 2021.

BMV Logo
Completed projects

13/04/2026

Preparation of the Elaborate on engineering geological-geotechnical conditions for the construction of the second phase of Line 1 and Line 2 of the Belgrade Metro, December 2023.

БГ Метро

Public utility company for the construction and operation of passenger transport by metro and the development of the city railway in Belgrade, "Belgrade Metro and Train", Belgrade

Vojvode Stepe 318, 11000 Belgrade

© 2026 Public Utility Company Belgrade Metro and Train. All rights reserved.

Instagram | JKP Beogradski metro i voz (@beogradski_metro_i_voz)