Project

Elaborate on geological research for the TBM section from para. Pancevac bridge (exclusively) until the end of the first phase of line 1, February 2023.

Line 1Completed projects

During the development of the Conceptual Project and the Justification Study with the Environmental Impact Assessment Study for Line 1 of the Belgrade Metro - Phase 2, a technical-economic analysis proved that the section from para. The Pančevački bridge (exclusively) until the end of the first phase of line 1, in the length of 1.2 km, should be built like the other parts of line 1 using the "TVM" machine (Tunnel Boring Machine), instead of the "Cut&Cover" construction technology proposed by the General Project. For the above reasons, field investigations are needed, as well as laboratory geomechanical tests of soil and rocks. The goal is to define the condition and properties of the terrain and rock masses, and on the basis of which the geotechnical conditions and recommendations for the construction of the future metro line will be defined for the Conceptual Project level.

БГ Метро

Public utility company for the construction and operation of passenger transport by metro and the development of the city railway in Belgrade, "Belgrade Metro and Train", Belgrade

Vojvode Stepe 318, 11000 Belgrade

© 2026 Public Utility Company Belgrade Metro and Train. All rights reserved.

Instagram | JKP Beogradski metro i voz (@beogradski_metro_i_voz)