Project

Elaborate on engineering geological-geotechnical construction conditions for the purposes of the Conceptual Project for the construction of the first phase of the first metro line in Belgrade from Makiš station to Karaburma station, November 2021.

Line 1Completed projects

Subject and tasks: definition of the state and properties of rock masses, geomechanical characteristics of rocks and soil, hydrogeological characteristics issued on the metro route, and based on which the geotechnical conditions and recommendations for the construction of the future metro line will be defined at the conceptual project level. Preparation of the Elaborate was preceded by field work and laboratory tests of soil and rock samples. The field work included exploratory drilling, mapping of drilled cores, taking water, soil and rock samples, SPT, CPT tests, pouring tests and geophysical measurements in boreholes (down hole test) and measurements on the surface of the field, which were completed (June 2021). On the route of the first phase of the first Line of the Belgrade Metro, 123 exploratory wells with a total depth of 4231 meters were drilled. The laboratory tests that were carried out in the geomechanical laboratory of the "Institute for Mining and Metallurgy Bor" and the "Mining Institute"-Zemun included tests on rock and soil samples (swelling, point load test, uniaxial strength, triaxial tests, abrasiveness, etc.) and were completed (July 2021). The Elaborate in question was prepared by the Consortium: Hidrozavod DTD, Institute for Mining and Metallurgy Bor, Mining Institute-Zemun, Geomag doo, Geoing Group (November 2021).

БГ Метро

Public utility company for the construction and operation of passenger transport by metro and the development of the city railway in Belgrade, "Belgrade Metro and Train", Belgrade

Vojvode Stepe 318, 11000 Belgrade

© 2026 Public Utility Company Belgrade Metro and Train. All rights reserved.

Instagram | JKP Beogradski metro i voz (@beogradski_metro_i_voz)