The subject of this technical documentation is the filling of the ground for the plateau depot of the future metro in Makiško polje and accompanying infrastructure facilities that form a functional and technological unit, which will be realized through preparatory works for the planned construction of the depot for the first line of the metro.
Project
Conceptual project of filling the ground in the area of the planned metro depot in Makiško polje - job holder Directorate for construction land and construction of Belgrade JP, July 2021.
Line 1Completed projects