Project overview for line 2
This page presents projects and studies implemented by the Public Utility Company "Belgrade Metro and Train", with the aim of providing transparent and clear insight into the company's activities and the development of the metro system in Belgrade.
Completed projects
13/04/2026
Digital topographic plan for the needs of planning and technical documentation for line 2 of the Belgrade metro and the joint depot of lines 2 and 3 in Bežanija, December 2021.
Completed projects
13/04/2026
Environmental protection report for the corridor of the planned two metro lines, contractor PUK Belgrade Metro and Train, February 2020
Completed projects
13/04/2026
Preparation of the Elaborate on engineering geological-geotechnical conditions for the construction of the second phase of Line 1 and Line 2 of the Belgrade Metro, December 2023.
Completed projects
13/04/2026
Preparation of the Elaborate on control geological investigations of the second phase of Line 2 of the Belgrade Metro, June 2025.
Completed projects
13/04/2026
Plan of the general regulation of the rail systems in Belgrade with elements of detailed elaboration for the first phase of the second line of the metro system, contractor: Urban Institute of Belgrade JP
13/04/2026
Prethodna studija opravdanosti sa Generalnim projektom, nosilac posla: Sekretarijat za investicije, Gradska uprava Grada Beograda (izradila projektantska kuća „EGIS Rail“), maj 2019. godine
Planned projects
13/04/2026
Project Manager of Belgrade Metro Line 2
13/04/2026
Survey of the existing condition of the interior, exterior of buildings and engineering structures of the second phase of Line 1 and Line 2 of the Belgrade Metro
Completed projects
13/04/2026
Recording of hydrotechnical facilities in the crossing zones with lines 1 and 2 of the Belgrade metro, July 2024.
13/04/2026