Project

Digital topographic plan for the needs of planning and technical documentation for line 2 of the Belgrade metro and the joint depot of lines 2 and 3 in Bežanija, December 2021.

Line 2Completed projects

Line 2 of the Belgrade metro from the station near the Bežanijsko groblje to the station in Mirijevo, for which planning and technical documentation is being developed, has a total length of about 21 km with a total of 23 stations. At the end terminus of Line 2, the construction of a common depot for lines 2 and 3 of the metro with an approximate area of ​​38ha is planned, which will be located west of the Bežanija cemetery. The boundary of recording the digital topographic plan on the sections between the stations should include a corridor with a total width of 160 m, 80 m to the left and right of the axis of the Line 2 metro line. In the zone of the stations, the boundary of the recording was extended, 160m from the axis of the route in a length of 200m. The recording boundary for the depot includes an area 80 m wider than the defined boundary for the construction of the depot.


БГ Метро

Public utility company for the construction and operation of passenger transport by metro and the development of the city railway in Belgrade, "Belgrade Metro and Train", Belgrade

Vojvode Stepe 318, 11000 Belgrade

© 2026 Public Utility Company Belgrade Metro and Train. All rights reserved.

Instagram | JKP Beogradski metro i voz (@beogradski_metro_i_voz)
JKP Beogradski metro i voz