The subject of this Study is analogous to the study for Line 1 of the Belgrade Metro. The general objectives of the Study are to provide high-quality information regarding the underground water regime, necessary for the preparation of technical documentation for several stages of design, based on the technical solution of the subway construction from the Conceptual Project of Line 1 Phase 2 and Line 2, and the results of previous geological and hydrogeological investigations. The specific goals of the Study are to obtain, based on numerical modeling for different hydrological conditions, the necessary elements for the purposes of designing and dimensioning the elements of protection of buildings (tunnel sections and stations) from groundwater, as well as to assess the influence of the impact on the construction of future buildings on the state of the groundwater regime in the wider area of the route of the second phase of Line 1 and Line 2 of the Belgrade Metro
Project
Underground water and infrastructure interaction studies of metro line 2 and second phase of line 1, November 2024.
Line 2Completed projects