The goal of the Conceptual Project and the Justification Study with the Environmental Impact Assessment Study for Line 1 of the Belgrade Metro - Phase 2 is to provide a technical and functional definition of Phase 2 of Metro Line 1, which includes a 4.6 km route with 5 stations: Ada Huja, Višnjička, Mirijevski Boulevard, 7. Gimnazija and Mirijevo.
The subject of this project is:
- Conceptual solution - IDR for the purposes of obtaining location conditions for metro line 1 - phase 2;
- Preliminary project for metro line 1 - phase 2;
- Feasibility Study for Metro Line 1 Phase 2;
- Social analyzes and analyzes of environmental protection for the purpose of preparation of the Study of justification and preparation of the Study on the assessment of the impact on the environment;
- Special Environmental Impact Assessment Study for the Makiš Depot, which is part of the Feasibility Study for Metro Line 1 - Phase 1
- Technical specifications and requirements that will be included in the Terms of Reference for the further stages of development of the metro line project 1 - phase 2: Project for construction permit, Project for execution and construction of infrastructure and systems.