Project

Plan for the general regulation of the rail systems in Belgrade with elements of development for the first phase of the first metro line - Geological foundations, contractor: Directorate for construction land and construction of Belgrade JP

Line 1Completed projects

The subject of this project is the creation of a geological foundation, i.e. engineering geological documentation, as a basis for the planning analysis of content and functional-technical solutions. The engineering geological documentation will define the geological structure, condition and properties of the terrain and rock masses, engineering geological conditions and limitations for the first phase of the metro line at the level of the Detailed Regulation Plan.

БГ Метро

Public utility company for the construction and operation of passenger transport by metro and the development of the city railway in Belgrade, "Belgrade Metro and Train", Belgrade

Vojvode Stepe 318, 11000 Belgrade

© 2026 Public Utility Company Belgrade Metro and Train. All rights reserved.

Instagram | JKP Beogradski metro i voz (@beogradski_metro_i_voz)
JKP Beogradski metro i voz