Ongoing Projects and Studies

BG Metro - Projects

Documentation being conducted by other public companies that will be the basis for the further development of technical documentation for the design and construction of Belgrade Metro.

In-depth: ongoing projects 

Survey of the existing state of the interior, exterior of buildings and structures of the second phase of line 1 and line 2 of the Belgrade metro

The aim of this Study is to analyze the existing state of buildings and structures within the zone of geotechnical influence of the second phase of line 1 and line 2 of the Belgrade metro. Based on the assessment of the existing state of buildings and structures, their inherent sensitivity to the impacts of the construction of tunnel sections, stations and the accompanying metro infrastructure will be determined. The purpose of the analysis is to apply the most up-to-date construction mitigation methods. The main cause of potential damages to buildings and structures is movement in the soil caused by: the passage of the "TBM" machine (Tunnel Boring Machine), underground construction of stations, supporting structures (vertical openings for ventilation and evacuation) and sections in "Cut&Cover", possible changes in the level of underground water during construction, as well as other causes arising from the driving of piles, soil compaction, etc. The objectives of the survey of the existing condition of buildings and structures are as follows:
• Interior and exterior inspection of existing buildings and structures within the GZI (Geotechnical Zone of Influence)
• Checking and assessing the condition of existing buildings and structures within the GZI in order to define their inherent sensitivity concerning soil deformation
• Checking and assessing the condition of existing buildings and structures within the GZI in order to define their inherent sensitivity to vibrations. This Study refers to buildings and structures in a broad sense and includes the following:
- All types of buildings (houses, buildings, skyscrapers, historical monuments, etc.) and their immediate surroundings
- Underground constructions such as ventilation openings, garages, underground pedestrian passages, etc.
- Bridges, viaducts, etc.

Study on geological research for the TBM section from Pančevački most station (excluded) to the end of the first phase of line 1

During the development of the Preliminary Design and the Feasibility Study with the Environmental Impact Assessment Study for Line 1, Phase 2 of Belgrade Metro, a technical-economic analysis showed that the section from the Pančevački most station (excluded) to the end of the first phase of line 1, in the length of 1.2 km, should be built like the other sections of line 1, using the "TBM" machine (Tunnel Boring Machine), instead of the "Cut&Cover" construction technology proposed by the General Design. Thus, it is necessary to conduct field investigations, as well as laboratory geo-mechanical tests of soil and rocks. The goal is to define the condition and properties of the terrain and rock masses. Geotechnical conditions and recommendations for the construction of the future metro line will be defined for the level of the Preliminary Design on the basis of those results.

Environmental Impact Assessment Study for the construction project of the Belgrade Metro Line 1 Phase 1

PUC "Belgrade Metro and Train" has started the procedure of developing an Environmental Impact Assessment Study in the name of the relevant Ministry of Environmental Protection. Line 1 runs in the southwest-northeast direction, on the right bank of the Sava River, from Železnik to Stari grad, then in the direction west-east on the south bank of the Danube to Ada Huja, and then in a north-south direction along the valley bottom that goes up Mirijevski bulevar to the final station "Mirijevo". The total length of the reference route is 21.8 km and includes 21 stations, and their construction is planned in two phases:
Phase 1: Železnik - Makiš - Žarkovo - Bele vode - Trgovačka - Požeška - "Banovo Brdo" Park - Ada Ciganlija - Sajam - Mostar - Savski trg – Trg republike - Skadarlija - Dunav - Pančevački most - Karaburma;
The subject of this environmental impact assessment is phase 1 of metro line 1, whose alignment, stations and shafts are shown in the following illustration. The total length of the alignment planned within phase 1 is 16.7 kilometers and consists of 16 stations.
Current activities related to the Study:
• Request for the scope and content of the Environmental Impact Assessment Study in the Ministry of Environmental Protection was submitted
• Delivery of the Request for the scope and content of the Environmental Impact Assessment Study was announced

Feasibility Study for Belgrade Metro Line 1 – Phase 2: Karaburma – Mirijevo and Preliminary Solution, Preliminary Design with Environmental Impact Assessment Study for Belgrade Metro Line 1 – Phase 2: Karaburma – Mirijevo, extraction of EIA for Makiš Depot from the whole metro line 1 phase 1 EIA, Investor: The Secretariat for Public Transport and PUC Belgrade Metro and Train (Designer: "Egis Rail")

The goal of the Preliminary Design and the Feasibility Study with the Environmental Impact Assessment Study for Line 1 of the Belgrade Metro - Phase 2 is to provide a technical and functional definition of Phase 2 of Metro Line 1, which includes a 4.6 km alignment with 5 stations: Ada Huja, Višnjička, Mirijevski bulevar, 7. gimnazija and Mirijevo.
The subjects of this project are:
• Preliminary Solution (IDR) for the purpose of obtaining Location Conditions for metro line 1 phase 2;
• Preliminary Design for metro line 1 phase 2;
• Feasibility Study for the metro line 1 phase 2;
• Environmental and Social analyses for the purpose of the preparation of the Feasibility Study and preparation of the Environmental Impact Assessment Study;
• Separate Environmental Impact Assessment Study for Makiš Depot which is a part of the Feasibility Study for the metro line 1 phase 2;
• Technical specifications and requirements to be included in the Terms of Reference of the further phases of development of the metro line 1 phase 2 project: Construction Permit Design, Detailed design and construction of infrastructure and systems.

Feasibility Study for Belgrade Metro Line 2 between Mirijevo and Bežanija, Conceptual Solution, Preliminary Design with Environmental Impact Assessment Study for Line 2, Conceptual Solution for metro line 2 extension Zemun – Bežanija area, Conceptual solution for Belgrade Metro Line 3 – extension between Surčinska and Bežanija, Investor: The Secretariat for Public Transport and PUC Belgrade Metro and Train (Designer: "Egis Rail")

The goal of the Preliminary Design and the Feasibility Study with the Environmental Impact Assessment Study is to provide a technical and functional definition of Line 2 (including the connection with Line 1 in Mirijevo and the technical and functional connection with Line 3 on Bežanija). Line 2 from Bežanija to Mirijevo has a total length of 21.1 km, with 23 stations: Bežanija, Kvantaška pijaca, Železnička stanica Zemun, Novi novosadski put, Filipa Višnjića, Stadion Zemun, Senjski trg, Aleksandra Dubčeka, Opština Novi Beograd, Merkator, Arena, Sava centar, Blok 18, Savski trg L2, Manjež, Makenzijeva, Južni bulevar, Šumatovačka, Vojislava Ilića, Cvetkova pijaca, Mite Ružića, Ustanička, Mirijevo L2.
The subjects of this project are:
• Prior studies: Conceptual Solution for metro line 2 extension Zemun – Bežanija area and for metro line 3 extension Surčinska - Bežanija – Transport demand study, ridership forecasting;
• Preliminary Solution (IDR) for the purpose of obtaining Location Conditions for the metro Line 2 with joint depot for lines 2 and 3 in Bežanija area;
• Preliminary Design (IDP) for the metro Line 2 with joint depot for lines 2 and 3 in Bežanija area;
• Feasibility Study for the metro Line 2 with joint depot for lines 2 and 3 in Bežanija area;
• Environmental and Social analyses for the purpose of the preparation of the Feasibility Study and redaction of the Environmental Impact Assessment (EIA) Study;
• Technical specifications and requirements to be included in the Terms of Reference for further phases of development of the metro line 2 project: Construction permit design, Detailed design and construction of infrastructure and systems.

Preparation of the Study on the engineering geological-geotechnical conditions of the construction of the second phase of line 1 and line 2 of the Belgrade metro

The length of the second phase of Line 1 is 4.9 km with 5 stations. The length of Line 2 is 20.6 km with 22 stations. Field research for Metro Line 2 will begin in early October and it will last until mid-June 2022. Field investigations, as well as laboratory geo-mechanical tests of soil and rocks, will be performed in parallel. The goal is to define the condition and properties of the terrain and rock masses, on the basis of which the geotechnical conditions and recommendations for the construction of future metro lines will be defined for the level of the Preliminary Design.

Conceptual solution for Belgrade Metro Line 3, Feasibility Study for Belgrade Metro Line 1 – Phase 1: Železnik – Karaburma taking into consideration future directions for the development of the three lines metro network, Preliminary Solution, Preliminary Design with Environmental Impact Assessment Study for Belgrade Metro Line 1 – Phase 1: Železnik – Karaburma, Investor: The Secretariat for Public Transport and PUC Belgrade Metro and Train (Designer: "Egis Rail")

The subjects of this project are:
• Developing the Conceptual Solution – Transport demand study and ridership forecasting update of the long-term metro network of the city of Belgrade, including Line 3;
• Developing the Preliminary Solution (IDR) for the purpose of obtaining Location Conditions for metro Line 1 Phase 1;
• Developing the Preliminary Design (IDP) for the metro Line 1 phase 1;
• Developing the Feasibility Study for the metro Line 1 Phase 1, considering the future development directions of the metro network consisting of three lines;
• Environmental and Social analyses for the purpose of the preparation of the Feasibility Study and the Environmental Impact Assessment (EIA) (metro Line 1 Phase 1);
• Technical specifications and requirements to be included in the Terms of Reference of the Construction Permit Design (PGD) for metro Line 1 Phase 1.